A Sawyer company - serving Woodland Hills, CA
A new rear addition with a vaulted beamed ceiling and tall windows

Ameristar Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Woodland Hills
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A walk-in pantry with wood shelving
A powder room with botanical wallpaper and a stone sink
A remodeled laundry and mudroom with a bench, cubbies and painted cabinets
A built-in window seat in a bay window
A dining nook with a built-in banquette
A home office with a built-in desk and shelves
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Ameristar Home Additions & ADU: The Woodland Hills Owner’s Guide

If you have an Ameristar home addition or ADU and something’s failing, the fix typically runs $45,000 – $130,000 fully installed in Woodland Hills, depending on scope. We stock and install the structural, finish, and mechanical parts that Ameristar projects commonly need, and we can usually diagnose the problem within one visit. Most owners discover the failure the same way: a door that suddenly won’t close square, a hairline crack running across new drywall, water staining on a ceiling that was buttoned up months ago, or an ADU that won’t hold temperature. Something shifted, or something was wrong from the start.

Call (341) 217-2776

Which Ameristar Models This Applies To

A garage converted into a guest room and home office

We work on Ameristar home additions and ADUs across the full range of what’s common in Woodland Hills: attached room additions, detached ADUs over 400 square feet, garage conversions, and second-story bump-outs. The compatibility question isn’t really about a model number the way it is with a water heater. It’s about what’s behind the walls and under the roof. Ameristar projects built in the last 10 to 15 years in this area tend to use specific framing packages, window rough openings, and roof tie-in methods. The part that usually fails first is the transition: where the addition meets the original house, or where the ADU roof ties into the main structure.

For OEM versus aftermarket, here’s what matters: Ameristar doesn’t make the lumber, the windows, or the roofing. Those come from manufacturers like GAF, James Hardie, and KraftMaid. What Ameristar provided was the structural system and the layout. So when we say “Ameristar-compatible,” we mean we match the framing dimensions, the load path, and the finish materials to what’s already there. A wrong-size header or a mismatched roof pitch looks fine for about six months. Then the drywall cracks and you’re paying twice.

How to Identify What You Have

Look for the plan set or the permit packet from the original build. The title block on page one will list the floor area, the roof pitch, and the structural assumptions. If you don’t have it, the San Fernando Valley building permit history for your address is available through the city. That record tells us the square footage, the construction type, and whether an ADU was built under a specific ordinance. Measurements matter more than brand names here: the span of the ridge beam, the spacing of the floor joists, and the size of the existing window openings. One thing we see often: Woodland Hills hillside lots have slope-stability requirements that flat-lot Ameristar builds didn’t have. When a part fails on a hillside addition, it’s usually not the part. It’s what the part was sitting on.

Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Ameristar Home Additions & ADU Is Failing

  • Doors that stick or won’t latch. This is almost never the door itself. The rough opening has shifted, which means the floor or the header has moved. In Woodland Hills, where we get hot dry summers and wet winters, clay soil expands and contracts enough to move a poorly founded addition a quarter inch.
  • Drywall cracks wider than the edge of a nickel, especially over doors or windows. Hairline cracks are normal settling. A crack that grows, or one that reopens after you patch it, is movement in the structure. That’s a load-path problem, not a paint problem.
  • Water staining at the ceiling-wall junction of the addition. This usually traces back to a roof tie-in that wasn’t flashed correctly, or a scupper that drains against the original siding. Left alone, it rots the top plate and the rafter ends.
  • The ADU won’t hold temperature, or you hear the HVAC cycling constantly. This can mean the insulation wasn’t installed to the rated R-value, the duct run is too long, or the wall sheathing was never sealed. In a Woodland Hills summer, a poorly insulated south-facing ADU wall can reach 140 degrees on the inside face.
  • The floor feels soft or bounces in one spot, usually near the entry or the bathroom. Moisture is a safe first bet. A failed wax ring or a slow supply leak rots the subfloor from underneath, and the vinyl plank hides it until you feel the bounce.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A second-story addition that matches the existing roofline

In Woodland Hills, a full home addition replacement of the failed structure or mechanical components runs $45,000 – $130,000. Here’s how the price stacks up based on what’s actually wrong:

  • Structural repair of a foundation or framing failure in an addition: $45,000 – $90,000, including engineered scope, permits, shoring, concrete or framing work, and finish restoration.
  • Full ADU construction after a failed or condemned existing unit: $90,000 – $220,000 for a code-compliant rebuild, depending on square footage, site access, and whether the old unit needs demo.
  • Garage conversion to correct a failed previous conversion: $30,000 – $80,000, which covers bringing the floor, insulation, and electrical up to current code.
  • Roof tie-in and flashing replacement on an existing addition: $8,000 – $20,000, parallel to our roof replacement range, but scoped specifically to the tie-in detail and matching existing materials.

Every estimate is a written line-item quote. The number you approve is the number on the invoice. That’s The Relay Standard, and it’s not an upgrade. The work carries the 365-Day Done Right Promise: if it’s not done right, we make it right, in writing, on every project.

DIY or Call Us?

What you can safely check yourself: water stains, gaps around exterior doors, cracked caulk joints, soft floor spots. Mark them with painter’s tape and watch them for a month. What you should not touch: any structural component, any electrical distribution in an ADU, any gas line, and anything on a roof with slope. A ridge beam or a load-bearing header under tension stores a lot of energy. Cut the wrong thing and a wall comes down with you inside the room. I learned framing at LA Trade-Tech, and I’ve spent two decades seeing what happens when someone with good intentions opens up a wall they shouldn’t have. The work tells you everything. We just make sure it tells the right story.

If the signs point to structural movement or water intrusion, call (341) 217-2776. We’ll inspect it for free and tell you honestly whether it’s a repair or a replacement, and what the written price will be before you commit to anything.

FAQs

A wide opening with a new beam where the kitchen wall was removed

Getting started with Sawyer in Woodland Hills

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Woodland Hills team

A local crew that works across Woodland Hills and the towns around it, to the same written standard as every Sawyer location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Woodland Hills? Licensed & insured · Written quotes before work starts response · free estimates
Call (341) 217-2776
Local Service Coverage

Request a Free Estimate in Woodland Hills

Tell us what you need - Sawyer Remodel Woodland Hills responds fast. No obligation.

By submitting this form, you confirm you have read our Privacy Policy and consent to receive communications through phone, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Text Us
Call Now - 24/7 Dispatch